QORZAVEN

Mirabelka Compact Kitchen 3.0 m — Columns

189.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Measured, then madeLaser survey and millimetre drawings before a panel is cut.
Fitted by the makersQORZAVEN's own fitters install, commission, take packaging away.
Kept at delivery standardFive years on cabinetry; parts stocked fifteen.

QORZAVEN Kitchens — the house's true living room

The Mirabelka refuses to shrink standards with the floor plan: a compact QORZAVEN kitchen with full 65 cm counters, real oak drawers, and column pairs that stack oven, fridge and pantry into a single dignified metre.

A kitchen is joinery asked to perform daily, so we build the boring parts beautifully: 19 mm carcases edged on all six sides, fronts in nano-matt laminate, lacquer or true veneer, and hinges and runners cycle-rated to two hundred thousand closes with soft-close as a given, not an upgrade. Every cabinet is levelled to millimetres and scribed to the walls your house actually has.

Design & Craft

  • 19 mm moisture-resistant carcases, dowelled and glued — no cam bolts
  • Laser site survey and millimetre workshop drawings before cutting
  • Made for city flats, guest houses and honest first kitchens
  • Column pairs stack oven, fridge and pantry into one metre
  • Solid-oak dovetailed drawer boxes with waxed running surfaces
  • Soft-close hinges rated to 200,000 cycles; drawers to 40 kg

Specifications

Run 3.0 m + columns
Counter Full 65 cm depth
Columns Oven + fridge + pantry stack
Carcase 19 mm MR board, dowelled
Drawers Solid oak, dovetailed
Weight ≈ 390 kg
Warranty 5 yr cabinetry, parts 15

Care

Wipe fronts with a damp microfibre and dry; no solvents, no scouring. Hinges and runners want a yearly two-minute check — or our care visit does it for you. Touch-up kits matched to your finish are stocked for fifteen years.

Questions, Answered

Can you work with my architect or builder?
Daily — we share drawings, coordinate services before walls close, and slot the fitting week into the site plan. The kitchen arrives when the site is ready for it, not before.

How long from order to cooking?
Survey to installed kitchen typically runs eight to twelve weeks: drawings and sign-off, cabinetry production, fitting week, then stone templating and the final fit. The schedule is written, and one person owns it.

The QORZAVEN Promise

Every QORZAVEN kitchen is measured twice and drawn once: laser survey, millimetre drawings, and stone templated digitally after the cabinets stand — the gap between plan and wall is ours to own.