QORZAVEN

Tartufo L-Kitchen 4+2.4 m

288.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Measured, then madeLaser survey and millimetre drawings before a panel is cut.
Fitted by the makersQORZAVEN's own fitters install, commission, take packaging away.
Kept at delivery standardFive years on cabinetry; parts stocked fifteen.

QORZAVEN Kitchens — the house's true living room

Two walls, one argument: the Tartufo runs the wet wall to the window and the tall wall to the ceiling — 19 mm carcases, oak drawer boxes, and a peninsula option that turns the short leg into breakfast.

A kitchen is joinery asked to perform daily, so we build the boring parts beautifully: 19 mm carcases edged on all six sides, fronts in nano-matt laminate, lacquer or true veneer, and hinges and runners cycle-rated to two hundred thousand closes with soft-close as a given, not an upgrade. Every cabinet is levelled to millimetres and scribed to the walls your house actually has.

Design & Craft

  • Installed, levelled and commissioned by QORZAVEN's own fitters
  • Solid-oak dovetailed drawer boxes with waxed running surfaces
  • Laser site survey and millimetre workshop drawings before cutting
  • Lacquer or through-coloured laminate faces, edges invisibly sealed
  • Work triangle drawn to your cooking, then dimensioned
  • Corner geometry resolved with full-extension mechanisms, not dead boxes

Specifications

Legs 4.0 + 2.4 m
Format L-plan
Corner Full-extension mechanism
Carcase 19 mm MR board, dowelled
Drawers Solid oak, dovetailed
Weight ≈ 699 kg
Warranty 5 yr cabinetry, parts 15

Care

Matt surfaces forgive fingerprints; spills still prefer promptness. Keep steam-heavy appliances ventilated as fitted, re-tune door gaps yearly with the supplied key, and the kitchen closes softly into old age.

Questions, Answered

Do you handle small awkward rooms?
Happily: compact compositions are drawn with the same care as estates, and the millimetres matter more, not less. Send the floor plan; we draw the honest options.

How long from order to cooking?
Survey to installed kitchen typically runs eight to twelve weeks: drawings and sign-off, cabinetry production, fitting week, then stone templating and the final fit. The schedule is written, and one person owns it.

The QORZAVEN Promise

One standard across the range: if it would not survive a decade of family breakfasts in our own test kitchen, it does not ship with the QORZAVEN mark.