QORZAVEN

Spizirna Handleless Kitchen 3.6 m

292.500,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Measured, then madeLaser survey and millimetre drawings before a panel is cut.
Fitted by the makersQORZAVEN's own fitters install, commission, take packaging away.
Kept at delivery standardFive years on cabinetry; parts stocked fifteen.

QORZAVEN Kitchens — the house's true living room

The Spizirna takes the handles away and leaves the architecture: true milled C-channels, shadow gaps aligned from plinth to cornice, and matt lacquer elevations that read as one quiet plane until they open.

Fronts age in hands, not showrooms: our matt surfaces shrug fingerprints, lacquers are cured for wipe-down life, and veneers are sequence-matched so the grain travels the run like it grew that way. Interiors come lined, drawers come dovetailed or steel-sided by range, and everything closes with the damped certainty that quietly announces the budget.

Design & Craft

  • 19 mm moisture-resistant carcases, dowelled and glued — no cam bolts
  • Lacquer or through-coloured laminate faces, edges invisibly sealed
  • Soft-close hinges rated to 200,000 cycles; drawers to 40 kg
  • True handleless: milled C-channel in the front, not glued profiles
  • 5 years on cabinetry, 200,000-cycle hardware; parts stocked 15
  • Installed, levelled and commissioned by QORZAVEN's own fitters

Specifications

Format Linear 3.6 m
Fronts Milled C-channel, matt lacquer
Gaps Aligned shadow lines
Carcase 19 mm MR board, dowelled
Opening Channel + push-to-open
Weight ≈ 737 kg
Warranty 5 yr cabinetry, parts 15

Care

Wipe fronts with a damp microfibre and dry; no solvents, no scouring. Hinges and runners want a yearly two-minute check — or our care visit does it for you. Touch-up kits matched to your finish are stocked for fifteen years.

Questions, Answered

How long from order to cooking?
Survey to installed kitchen typically runs eight to twelve weeks: drawings and sign-off, cabinetry production, fitting week, then stone templating and the final fit. The schedule is written, and one person owns it.

Can you work with my architect or builder?
Daily — we share drawings, coordinate services before walls close, and slot the fitting week into the site plan. The kitchen arrives when the site is ready for it, not before.

The QORZAVEN Promise

One standard across the range: if it would not survive a decade of family breakfasts in our own test kitchen, it does not ship with the QORZAVEN mark.