QORZAVEN

Mezzaluna Handleless Kitchen L 4+2.4 m

498.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Measured, then madeLaser survey and millimetre drawings before a panel is cut.
Fitted by the makersQORZAVEN's own fitters install, commission, take packaging away.
Kept at delivery standardFive years on cabinetry; parts stocked fifteen.

QORZAVEN Kitchens — the house's true living room

The Mezzaluna takes the handles away and leaves the architecture: true milled C-channels, shadow gaps aligned from plinth to cornice, and matt lacquer elevations that read as one quiet plane until they open.

Fronts age in hands, not showrooms: our matt surfaces shrug fingerprints, lacquers are cured for wipe-down life, and veneers are sequence-matched so the grain travels the run like it grew that way. Interiors come lined, drawers come dovetailed or steel-sided by range, and everything closes with the damped certainty that quietly announces the budget.

Design & Craft

  • Monolithic elevations that photograph like joinery, not furniture
  • Lacquer or through-coloured laminate faces, edges invisibly sealed
  • Laser site survey and millimetre workshop drawings before cutting
  • Solid-oak dovetailed drawer boxes with waxed running surfaces
  • Soft-close hinges rated to 200,000 cycles; drawers to 40 kg
  • 19 mm moisture-resistant carcases, dowelled and glued — no cam bolts

Specifications

Format L-plan 4.0 + 2.4 m
Fronts Milled C-channel, matt lacquer
Gaps Aligned shadow lines
Carcase 19 mm MR board, dowelled
Opening Channel + push-to-open
Weight ≈ 922 kg
Warranty 5 yr cabinetry, parts 15

Care

Matt surfaces forgive fingerprints; spills still prefer promptness. Keep steam-heavy appliances ventilated as fitted, re-tune door gaps yearly with the supplied key, and the kitchen closes softly into old age.

Questions, Answered

Can you work with my architect or builder?
Daily — we share drawings, coordinate services before walls close, and slot the fitting week into the site plan. The kitchen arrives when the site is ready for it, not before.

How long from order to cooking?
Survey to installed kitchen typically runs eight to twelve weeks: drawings and sign-off, cabinetry production, fitting week, then stone templating and the final fit. The schedule is written, and one person owns it.

The QORZAVEN Promise

One hand holds the whole project — cabinetry, stone, appliances and fitting on one contract, one schedule, and one person who answers the phone by name.