QORZAVEN

Fregola Handleless Kitchen L 4+2.4 m

353.000,00 Kč

Tax included where applicable. Delivery and commissioning arranged by your concierge.

Measured, then madeLaser survey and millimetre drawings before a panel is cut.
Fitted by the makersQORZAVEN's own fitters install, commission, take packaging away.
Kept at delivery standardFive years on cabinetry; parts stocked fifteen.

QORZAVEN Kitchens — the house's true living room

The Fregola takes the handles away and leaves the architecture: true milled C-channels, shadow gaps aligned from plinth to cornice, and matt lacquer elevations that read as one quiet plane until they open.

A kitchen is joinery asked to perform daily, so we build the boring parts beautifully: 19 mm carcases edged on all six sides, fronts in nano-matt laminate, lacquer or true veneer, and hinges and runners cycle-rated to two hundred thousand closes with soft-close as a given, not an upgrade. Every cabinet is levelled to millimetres and scribed to the walls your house actually has.

Design & Craft

  • Installed, levelled and commissioned by QORZAVEN's own fitters
  • 19 mm moisture-resistant carcases, dowelled and glued — no cam bolts
  • Monolithic elevations that photograph like joinery, not furniture
  • Shadow gaps aligned through drawers, doors and tall units
  • True handleless: milled C-channel in the front, not glued profiles
  • Lacquer or through-coloured laminate faces, edges invisibly sealed

Specifications

Format L-plan 4.0 + 2.4 m
Fronts Milled C-channel, matt lacquer
Gaps Aligned shadow lines
Carcase 19 mm MR board, dowelled
Opening Channel + push-to-open
Weight ≈ 796 kg
Warranty 5 yr cabinetry, parts 15

Care

Wipe fronts with a damp microfibre and dry; no solvents, no scouring. Hinges and runners want a yearly two-minute check — or our care visit does it for you. Touch-up kits matched to your finish are stocked for fifteen years.

Questions, Answered

Can you work with my architect or builder?
Daily — we share drawings, coordinate services before walls close, and slot the fitting week into the site plan. The kitchen arrives when the site is ready for it, not before.

How long from order to cooking?
Survey to installed kitchen typically runs eight to twelve weeks: drawings and sign-off, cabinetry production, fitting week, then stone templating and the final fit. The schedule is written, and one person owns it.

The QORZAVEN Promise

One hand holds the whole project — cabinetry, stone, appliances and fitting on one contract, one schedule, and one person who answers the phone by name.